A man-made island, 4 km long and 2.5 km wide, was proposed.

Construction started in 1987.

A sea wall was erected made of rock and 48,000 concrete blocks.

kansai-int-airport-6

Three mountains were excavated for 21,000,000 cubic meter of landfill.

A three kilometer bridge connects the island to the mainland.

Photo credit

The total cost of Kansai Airport is estimated to be $20 billion.

kansai-int-airport-4

This includes land reclamation, two runways, terminal and facilities.

Despite the early misfortunes, the Kansai International Airport is a great engineering achievement.